Sunday, 15 September 2013

Ashby end

We pulled pins at bridge 5 on Thursday morning at 07.45 and made our way towards Stoke Golding where we hoped to pick up a mooring for the night.

                                                   The triumph factory at Hinckley.

At bridge 23 there is a farm shop that is well worth visiting. I bought a lovely large pork chop for a couple of quid that went down a treat with a few glasses of red wine. We will stop again on the trip back down the Ashby.
We found a 48 hour mooring at Stoke Golding with good internet and tv this will do us tonight.


 We decided to walk into the village to pick up a newspaper but found the village store had closed down. Not to worry though there was a post office next door. The post office was closed for lunch, so with a pub next door and with10 minutes to spare there was only one thing to do. ( £7 for 2 pints of lager !!!. )When the post office opened we discovered they didn't sell newspapers. in fact they didn't sell much. So I now need to amend the canal guide book to no provisions and expensive lager in Stoke Golding.

We pulled pins at 08.10 on Friday morning and headed towards Snarestone which is the end of the Ashby canal.

Repairs being made to the offside bank. Stakes are driven into the canal bed then a membrane is fixed to the stakes, finally mud from the canal bottom is filled in behind the membrane. In a very short time plants start to grow and a new canal bank is formed.

Carolyn is now getting a lot more confident on the tiller. She just needs to practice steering in and out of a few more locks.
                                                  And steer through some tunnels. (snarestone tunnel)

Our mooring at the end of the Ashby canal. The restoration is continuing but for the time being this is as far as you can get.

                            There is a small shop which raises money for the restoration. And as Carolyn can't pass a shop without going in she had to check it out.

We had a good night and pulled pins on Saturday at 09.00 as we had to find a mooring with good road access as we where due to meet our friends Tony and Maureen.

We found a mooring at Shackerstone and after getting lost on route our visitors finally found us. It was great to see them both and we will catch up again when we come down to Devon in November.

We did intend on staying at Shackerstone but with poor internet and hundreds of wasps (one of them stung my ankle) we decided to move.

How organised is this....It's Not Inca
 
We eventually found a very isolated mooring out in the country. We have good tv and internet and good dog walking. The weather forecast for the next couple of days is heavy rain and high winds. The rain is not a problem but the wind is as narrowboats do not handle very well in such conditions.  This will do us for a couple of days.
 
Happy Days

Wednesday, 11 September 2013

Up the Ashby

We pulled pins at 09.00 this morning (Wednesday) with the intention of getting on to the Ashby canal. A few boaters have said to us don't bother because it is so shallow up there it is more trouble than its worth. But we have been told before don't go here don't go there and don't do that. We decided a long time ago to give everything a go and so far it has been OK.

We have not bought any diesel since we were on our way down to London so with the tank getting down we filled up at Springwood haven (Not the ideal thing to do and add weight when going up a shallow canal) and bought 4 bags of coal as we have now lit the fire. We have seen prices up to 0.97 pence per litre for red diesel. So at 0.88 pence per litre we had to buy some.

Anyway over £200 lighter we were soon on our way.

                                                           They need to speed up !!!.

               Sod that for a job......... We did ask them for some wood but they wouldn't give us any.

                                                         Hello Luvvie ..... One for you.
                               The very narrow entrance to the Ashby canal. At Marston junction.
  Made it with only a small bump on the port side.
 
We have gone aground 3 times but only when passing other boats and have managed to re float OK. And we have also pulled an American couple off a bend when they went hard aground in a hire boat. (good deed of the day)

 
After several attempts to get onto various mooring spots and finding them too shallow we finally made it to the visitor moorings at bridge 5. It is now raining cats and dogs but the fire is now lit and we are as snug as a bug in a rug.

                            Happy Days

Tuesday, 10 September 2013

Plum jam

We pulled pins at 07.45 on Monday with the aim of getting through Tamworth and mooring on the other side of the town. But on the way as we were passing an out of town shopping centre ,we just had to stop and go and have a look around.....said Carolyn.

A couple of hours later and we were on our way again. They gave good weather but it hammered down most of the morning . Still we didn't mind getting wet . We enjoy it what ever the weather throws at us.

      We passed this hire van....What letter would a naughty minded person paint on this van...
                               You thought it!!! ......not me... I thought a T or a B

                                     Our mooring for the night opposite Tamworth golf course.

 Not long after mooring this old man and his dog stopped talking to us and before long he was showing us all the tricks the dog could do....like balancing a biscuit on his nose then tossing it in the air and catching it in his mouth...good boy


Tuesday morning we pulled pins at 07.15 as we wanted to get up the Atherstone flight of 11 locks as early as possible.

                      Saw this under a motorway bridge....Carolyn reckons its a Banksy.

                                                    What Carolyn needs to pack the fags in.


 Half way up Atherstone locks we came across this plum tree. All the ones at the bottom of the tree had been picked but it was loaded at the top. So it was out with the fishing landing net and we soon had enough to make several pots of jam.

                                                       Look what I've got !!!!

                                     We have also now started to collect wood for the fire.


                                                  Our mooring for Tuesday night.

We also picked some blackberries and apples. So tonight we have lovely crumble for dessert. yum!

Tomorrow we will pull pins a bit later in the morning. They give rain early in the morning and clearing later. But when can you believe what the weather man says.

                                    Happy Days

Sunday, 8 September 2013

RCR to the rescue

Later on Saturday we got a call from Pete at River Canal Rescue to say that they had located a new lever assembly. The only problem was it was in Middlewich in Cheshire. The plan was for an RCR man to pick it up and drive it down to Pete . With the time getting on Pete said it would now be tomorrow before he gets back to us. That was no great problem for us.

 At 11.15 on Sunday morning Pete from RCR turned up with the new lever assembly and had it fitted in no time at all.

                                All fitted and it is a lot smoother to use than the old one.

What a great service that was. It did cost us £50 excess on top of our yearly policy of £130, but when you consider the part alone was £238 and what they did to get us going again in such a short time it was money well spent.

                                      Happy Days

Saturday, 7 September 2013

oops

We were up at 06.30 on Saturday and ready to pull pins at 07.15. We started the engine untied the mooring lines and put Inca into gear.

                          The single lever that puts the engine into gear and operates the throttle.

                                                       OOPS...... And Inca goes nowhere.

                                                                             W T F 

For some bizarre reason the lever had snapped off leaving us stranded. Luckily we are members of the  River and Canal rescue ( The AA of the waterways ) and after a call at 08.30 we had a visit from Pete and his apprentice Dillon at 10.30.

They removed the whole assembly and took it away to try and find a replacement. In the meantime we are stuck in Hopwas.

We will update on progress.................

                                                    Happy Days